LogisticooHeavy & Project

Industries

Out-of-gauge transport for agriculture and farm machinery dealers

Farm machinery dealers and contractors move wide machines: combines, forage harvesters, beet harvesters, large implements. Silos, tanks and barn components are added. Seasonal peaks and farm access shape the planning.

What matters

Wide machines
Over-width is the rule, weight usually less critical.
Season
Before harvest and sowing, vehicles and permits are scarce.
Farm access
Narrow farm gates, bridges over ditches, soft tracks.
Silos and tanks
Large and thin-walled, erected by crane.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Which machine or installation, with dimensions?
  2. From where to where?
  3. What is the farm access like?
  4. By when is it needed?
  5. Is unloading help available on site?

What we need from you

  • Machine and dimensions
  • Route
  • Date
  • Farm access

Preparation: You hand over the cargo ready for loading with known lifting points – dismantling, assembly and foundation work are handled by your team or your installation partner.

What we do for you

What we organise

  • Feasibility check per project with questions on missing values
  • Coordination of permits, escort vehicles, route surveys and lifting equipment via partners
  • Quote with the agreed scope once the transport can be planned

Good to know

If the dimensions stay within normal limits, Logisticoo Machinery can also plan your transport – we refer you accordingly.

How it works

  1. 01

    Request

    You state the cargo, dimensions and weight per piece with units, rough route and time window – marking anything unknown.

  2. 02

    Review

    We check dimensions, route and access and clarify vehicle and permit.

  3. 03

    Quote

    After the feasibility check you receive a quote with the agreed scope, including partner services.

  4. 04

    Execution

    Transport after permit, unloading at the dealer or farm.

Questions and answers: Agriculture and farm machinery dealers

When should dealers plan seasonal machine transports?

Early before the season, because permits and vehicles are in high demand then.

What should be considered for farm access?

Width of the gate, load capacity of tracks and bridges and enough space to unload.

Can a silo be erected on the farm?

Yes, with a partner crane. The foundation must be prepared.

Request

Request for this topic: Agriculture and farm machinery dealers

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Machine and dimensions
  • Route
  • Date
  • Farm access

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm CET

Route and time window

Start (approx.)
Destination (approx.)

We check every route and come back with a proposal.

Time window

Cargo and project data

A short description is enough.

Dimensions per piece (L × W × H)

Please with unit. Comma or point as decimal separator, e.g. 3.85 m.

Weight per piece
Can the load be divided? (optional)
Known loading conditions (optional)

What should we coordinate via our partners? (optional)

Whether and to what extent anything is needed is checked per project.

You can send technical drawings after our first reply. Unknown values lead to questions – not to an estimated price commitment.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.

Have your project reviewed