Divisible or indivisible loads
Permits for out-of-gauge and overweight loads are usually only granted for loads that cannot be divided without disproportionate effort – in the UK, the term is abnormal indivisible load. Whether a load counts as indivisible is therefore one of the first planning questions.
What matters
- Indivisible
- A piece that cannot be dismantled without disproportionate effort or damage.
- Divisible
- Several pieces that could also be transported individually within the limits.
- Additional cargo
- Extra pieces on a permitted transport are only allowed to a limited extent.
- Dismantling
- Sometimes cheaper than a large special transport – sometimes more expensive because of assembly.
Planning questions
We clarify these points before quoting – the earlier they are known, the more precise the plan.
- Can the goods be dismantled?
- With what effort?
- What do they weigh and measure dismantled?
- Should further pieces travel along?
- What does the manufacturer say about dismantling?
What we need from you
- Divisibility (form: yes, no, unclear)
- Dimensions dismantled and complete
- Dismantling effort
- Additional cargo
Preparation: You hand over the cargo ready for loading with known lifting points – dismantling, assembly and foundation work are handled by your team or your installation partner.
What we do for you
What we organise
- Feasibility check per project with questions on missing values
- Coordination of permits, escort vehicles, route surveys and lifting equipment via partners
- Quote with the agreed scope once the transport can be planned
Good to know
Describe why the load cannot be divided – this helps the authority with its classification.
How it works
- 01
Request
You state the cargo, dimensions and weight per piece with units, rough route and time window – marking anything unknown.
- 02
Review
We check whether the load counts as indivisible and compare alternatives.
- 03
Quote
After the feasibility check you receive a quote with the agreed scope, including partner services.
- 04
Execution
Permit and transport according to the chosen solution.
Questions and answers: Divisible or indivisible loads
What is an indivisible load?
Goods that cannot be divided into smaller pieces without disproportionate effort or damage.
Why does divisibility matter for the permit?
Because permits for out-of-gauge and overweight are usually only granted for indivisible loads.
May further pieces travel on a heavy transport?
Only to a limited extent and if the permit allows it. We clarify this in advance.
Request
Request for this topic: Divisible or indivisible loads
Three steps. Anything you do not know yet can be left open.
Details for planning
- Divisibility (form: yes, no, unclear)
- Dimensions dismantled and complete
- Dismantling effort
- Additional cargo