Transporting large steel structures

Trusses, frames, platforms, stair towers and plant structures are rarely heavy relative to their size – but bulky. Whether they travel pre-assembled or in parts decides permit, vehicle and assembly effort.

What matters

Bulky geometry
Irregular shapes make support and securing harder.
Pre-assembled or dismantled
Pre-assembly saves site time but can make transport more complex.
Deformation
Long, slender pieces must not distort when lifted and lashed.
Assembly sequence
Deliver pieces in installation order.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Which structure, with envelope dimensions and weight?
  2. Pre-assembled or in parts?
  3. How many pieces?
  4. Where and how is lifting done?
  5. Is there an assembly plan?

What we need from you

  • Envelope dimensions and weights
  • Parts list
  • Site
  • Assembly dates

Preparation: You hand over the cargo ready for loading with known lifting points – dismantling, assembly and foundation work are handled by your team or your installation partner.

What we do for you

What we organise

  • Feasibility check per project with questions on missing values
  • Coordination of permits, escort vehicles, route surveys and lifting equipment via partners
  • Quote with the agreed scope once the transport can be planned

Good to know

Talk to us before deciding on pre-assembly – we show you which split makes the transport easiest.

How it works

  1. 01

    Request

    You state the cargo, dimensions and weight per piece with units, rough route and time window – marking anything unknown.

  2. 02

    Review

    We check envelope dimensions and divisibility and propose a transport solution.

  3. 03

    Quote

    After the feasibility check you receive a quote with the agreed scope, including partner services.

  4. 04

    Execution

    Transports after permit, delivery in assembly sequence.

Questions and answers: Steel structures

Should a steel structure be transported pre-assembled?

That depends on the project. Pre-assembly saves site time but can make permit and vehicle more complex.

Which dimensions do you need for bulky structures?

The envelope dimensions – the greatest length, width and height – and the weight.

How is deformation avoided during transport?

Through suitable supports and lashing points; where needed with transport bracing fitted by the fabricator.

Request

Request for this topic: Steel structures

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Envelope dimensions and weights
  • Parts list
  • Site
  • Assembly dates

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm CET

Route and time window

Start (approx.)
Destination (approx.)

We check every route and come back with a proposal.

Time window

Cargo and project data

A short description is enough.

Dimensions per piece (L × W × H)

Please with unit. Comma or point as decimal separator, e.g. 3.85 m.

Weight per piece
Can the load be divided? (optional)
Known loading conditions (optional)

What should we coordinate via our partners? (optional)

Whether and to what extent anything is needed is checked per project.

You can send technical drawings after our first reply. Unknown values lead to questions – not to an estimated price commitment.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.

Have your project reviewed