What drives the cost of a heavy transport

A heavy transport has no per-kilometre price. Costs arise from many building blocks that affect one another: vehicle, permits, escorts, route measures, crane and time. Knowing them allows targeted savings.

What matters

Dimensions and weight
Determine vehicle, permit and escort – every centimetre of width can count.
Route
Detours, route measures and bridge assessments cost money.
Escort and travel times
Night travel and multi-day journeys increase effort.
Crane and waiting time
Lifting and poorly prepared loading points are often underestimated.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Can dimensions be reduced by removing parts?
  2. Is the time window flexible?
  3. Is lifting available on site?
  4. Can pieces be bundled?
  5. How well prepared is the loading point?

What we need from you

  • Dimensions and weight
  • Flexibility
  • Lifting
  • Loading points

Preparation: You hand over the cargo ready for loading with known lifting points – dismantling, assembly and foundation work are handled by your team or your installation partner.

What we do for you

What we organise

  • Feasibility check per project with questions on missing values
  • Coordination of permits, escort vehicles, route surveys and lifting equipment via partners
  • Quote with the agreed scope once the transport can be planned

Good to know

With complete details on dimensions, weight and route you receive a quote that reflects your project precisely.

How it works

  1. 01

    Request

    You state the cargo, dimensions and weight per piece with units, rough route and time window – marking anything unknown.

  2. 02

    Review

    After the review we show which building blocks determine the price and where there is room.

  3. 03

    Quote

    After the feasibility check you receive a quote with the agreed scope, including partner services.

  4. 04

    Execution

    The quote lists the agreed services individually.

Questions and answers: What drives the cost

What does a heavy transport cost?

That depends on dimensions, weight, route, permits, escorts and crane. We state a price after the review.

How can costs be reduced?

For example by removing attachments, flexible dates, well-prepared loading points and bundled pieces.

Why are there no flat prices?

Because every heavy transport needs different building blocks. A flat rate would be either too high or not sustainable.

Request

Request for this topic: What drives the cost

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Dimensions and weight
  • Flexibility
  • Lifting
  • Loading points

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm CET

Route and time window

Start (approx.)
Destination (approx.)

We check every route and come back with a proposal.

Time window

Cargo and project data

A short description is enough.

Dimensions per piece (L × W × H)

Please with unit. Comma or point as decimal separator, e.g. 3.85 m.

Weight per piece
Can the load be divided? (optional)
Known loading conditions (optional)

What should we coordinate via our partners? (optional)

Whether and to what extent anything is needed is checked per project.

You can send technical drawings after our first reply. Unknown values lead to questions – not to an estimated price commitment.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.

Have your project reviewed