How a permit procedure for heavy transport works

In most countries a permit procedure follows a similar pattern: application with exact data, review by the competent authority and bodies along the route, decision with conditions. How long it takes depends on route, dimensions and authority.

What matters

Data
Goods, dimensions, weights, vehicle combination, axle loads, route.
Application
With the competent authority – via partners who know the procedure.
Consultation
Road authorities and other bodies along the route take part in the review.
Decision
Permission with route, times, escort and further conditions.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Are dimensions and weights confirmed?
  2. Is the vehicle known?
  3. Which countries are on the route?
  4. When should the transport travel?
  5. Is the load indivisible?

What we need from you

  • Exact data
  • Route
  • Time window
  • Divisibility

Preparation: You hand over the cargo ready for loading with known lifting points – dismantling, assembly and foundation work are handled by your team or your installation partner.

What we do for you

What we organise

  • Feasibility check per project with questions on missing values
  • Coordination of permits, escort vehicles, route surveys and lifting equipment via partners
  • Quote with the agreed scope once the transport can be planned

Good to know

This page shows typical processes – we clarify the details of your permit with our partners and the responsible authority.

How it works

  1. 01

    Request

    You state the cargo, dimensions and weight per piece with units, rough route and time window – marking anything unknown.

  2. 02

    Review

    We check the data and coordinate the application with partners.

  3. 03

    Quote

    After the feasibility check you receive a quote with the agreed scope, including partner services.

  4. 04

    Execution

    The transport only travels with a valid decision and according to its conditions.

Questions and answers: How a permit procedure works

How does a heavy transport permit work?

Application with exact data, review by the authority and bodies involved, decision with conditions – only then may it travel.

What does the duration depend on?

On country, authority, route, dimensions and weight. Complete details and an early request shorten the process – we give you the realistic lead time after the review.

Do I need a separate permit in every country?

Usually yes – every country crossed has its own procedure.

Request

Request for this topic: How a permit procedure works

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Exact data
  • Route
  • Time window
  • Divisibility

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm CET

Route and time window

Start (approx.)
Destination (approx.)

We check every route and come back with a proposal.

Time window

Cargo and project data

A short description is enough.

Dimensions per piece (L × W × H)

Please with unit. Comma or point as decimal separator, e.g. 3.85 m.

Weight per piece
Can the load be divided? (optional)
Known loading conditions (optional)

What should we coordinate via our partners? (optional)

Whether and to what extent anything is needed is checked per project.

You can send technical drawings after our first reply. Unknown values lead to questions – not to an estimated price commitment.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.

Have your project reviewed