LogisticooHeavy & Project

Cargo

Transporting boats and yachts

Moving boats and yachts over land is above all a question of width and height. Hull, keel and superstructure determine support; masts and antennas are removed beforehand. At yard and port a crane or travel lift usually lifts.

What matters

Width and height
Hull width and height including support determine route and permit.
Support
On cradles or stands at the points intended by the manufacturer.
Dismantling
Remove and secure mast, antennas, arches and loose parts beforehand.
Crane or travel lift
Lifting in and out at yard or port – with their equipment or via partners.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. What length, beam, height and weight?
  2. Is there a cradle?
  3. What is removed beforehand?
  4. Who lifts at collection and destination?
  5. Yard, port or hall?

What we need from you

  • Dimensions and weight
  • Support
  • Collection and destination
  • Date

Preparation: You hand over the cargo ready for loading with known lifting points – dismantling, assembly and foundation work are handled by your team or your installation partner.

What we do for you

What we organise

  • Feasibility check per project with questions on missing values
  • Coordination of permits, escort vehicles, route surveys and lifting equipment via partners
  • Quote with the agreed scope once the transport can be planned

Good to know

Plan mast stepping and lifting in and out with your yard – we align the transport with those dates.

How it works

  1. 01

    Request

    You state the cargo, dimensions and weight per piece with units, rough route and time window – marking anything unknown.

  2. 02

    Review

    We check dimensions and route and clarify vehicle, permit and lifting.

  3. 03

    Quote

    After the feasibility check you receive a quote with the agreed scope, including partner services.

  4. 04

    Execution

    Transport after permit, handover at yard, port or hall.

Questions and answers: Boats and yachts

Why do yachts often need special transport?

Because hull beam and height on the vehicle exceed the generally permitted dimensions.

Must the mast be removed before transport?

Yes, masts and tall superstructures are removed beforehand and secured separately.

Who lifts the boat out of the water?

The yard or port with crane or travel lift; where needed we organise lifting via partners.

Request

Request for this topic: Boats and yachts

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Dimensions and weight
  • Support
  • Collection and destination
  • Date

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm CET

Route and time window

Start (approx.)
Destination (approx.)

We check every route and come back with a proposal.

Time window

Cargo and project data

A short description is enough.

Dimensions per piece (L × W × H)

Please with unit. Comma or point as decimal separator, e.g. 3.85 m.

Weight per piece
Can the load be divided? (optional)
Known loading conditions (optional)

What should we coordinate via our partners? (optional)

Whether and to what extent anything is needed is checked per project.

You can send technical drawings after our first reply. Unknown values lead to questions – not to an estimated price commitment.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.

Have your project reviewed