Heavy transport for shipbuilding and shipyards

Shipyards receive heavy and bulky components from suppliers: engines, gearboxes, propellers, shafts, rudders, prefabricated sections. Yacht yards move finished boats overland. The destination is often a quay or hall with its own cranes.

What matters

Heavy components
Engines, shafts and propellers are compact and heavy.
Sections
Prefabricated hull sections are wide and tall.
Quay and hall
Yard cranes often handle unloading.
Yachts
Finished boats on cradles overland.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Which component, with dimensions and weight?
  2. Where is delivery – quay, hall?
  3. Is there a yard crane?
  4. From which supplier?
  5. Is there an installation date?

What we need from you

  • Component, dimensions, weight
  • Delivery point
  • Lifting
  • Date

Preparation: You hand over the cargo ready for loading with known lifting points – dismantling, assembly and foundation work are handled by your team or your installation partner.

What we do for you

What we organise

  • Feasibility check per project with questions on missing values
  • Coordination of permits, escort vehicles, route surveys and lifting equipment via partners
  • Quote with the agreed scope once the transport can be planned

Good to know

Tell us the yard's installation date – we plan delivery so assembly on board can start straight away.

How it works

  1. 01

    Request

    You state the cargo, dimensions and weight per piece with units, rough route and time window – marking anything unknown.

  2. 02

    Review

    We check component and route and clarify permit and lifting.

  3. 03

    Quote

    After the feasibility check you receive a quote with the agreed scope, including partner services.

  4. 04

    Execution

    Transport after permit, unloading at quay or hall.

Questions and answers: Shipbuilding and shipyards

Which shipyard transports does Logisticoo handle?

Heavy and large components such as engines, shafts, propellers and sections, as well as boats overland.

Who unloads at the yard?

Usually the yard with its own cranes; where needed we organise lifting via partners.

How are propellers protected?

Supported on frames and protected at the blades, as specified by the manufacturer.

Request

Request for this topic: Shipbuilding and shipyards

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Component, dimensions, weight
  • Delivery point
  • Lifting
  • Date

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm CET

Route and time window

Start (approx.)
Destination (approx.)

We check every route and come back with a proposal.

Time window

Cargo and project data

A short description is enough.

Dimensions per piece (L × W × H)

Please with unit. Comma or point as decimal separator, e.g. 3.85 m.

Weight per piece
Can the load be divided? (optional)
Known loading conditions (optional)

What should we coordinate via our partners? (optional)

Whether and to what extent anything is needed is checked per project.

You can send technical drawings after our first reply. Unknown values lead to questions – not to an estimated price commitment.