Transport for wind energy

Wind farms are often far from motorways. Rotor blades, tower sections and nacelles must travel overland from factory or port to the site – with route surveys, permits, escorts and site access that allows it.

What matters

Components
Rotor blades, tower sections, nacelles, hubs, drivetrains.
Route
Bends, roundabouts and village crossings are critical.
Site access
Access roads and crane pads in the wind farm.
Erection sequence
Deliveries matched to crane and erection.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Which components, how many turbines?
  2. From where – factory or port?
  3. What is site access like in the park?
  4. Is there an erection plan?
  5. Who is the project contact?

What we need from you

  • Components
  • Site
  • Erection plan
  • Collection point

Preparation: You hand over the cargo ready for loading with known lifting points – dismantling, assembly and foundation work are handled by your team or your installation partner.

What we do for you

What we organise

  • Feasibility check per project with questions on missing values
  • Coordination of permits, escort vehicles, route surveys and lifting equipment via partners
  • Quote with the agreed scope once the transport can be planned

Good to know

A finished, load-bearing access road is the basis – we plan delivery to match the erection date.

How it works

  1. 01

    Request

    You state the cargo, dimensions and weight per piece with units, rough route and time window – marking anything unknown.

  2. 02

    Review

    We check route and site access and clarify permits, escorts and vehicles.

  3. 03

    Quote

    After the feasibility check you receive a quote with the agreed scope, including partner services.

  4. 04

    Execution

    Transports after permit, in step with erection.

Questions and answers: Wind energy

Which wind components does Logisticoo transport?

Rotor blades, tower sections, nacelles and hubs – after review and with partners for vehicles and escorts.

What matters for wind farm access?

Width, turning radii and load capacity – for long blades and heavy nacelles.

How early should wind farm transports be planned?

Very early, because route surveys and permits need lead time.

Request

Request for this topic: Wind energy

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Components
  • Site
  • Erection plan
  • Collection point

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm CET

Route and time window

Start (approx.)
Destination (approx.)

We check every route and come back with a proposal.

Time window

Cargo and project data

A short description is enough.

Dimensions per piece (L × W × H)

Please with unit. Comma or point as decimal separator, e.g. 3.85 m.

Weight per piece
Can the load be divided? (optional)
Known loading conditions (optional)

What should we coordinate via our partners? (optional)

Whether and to what extent anything is needed is checked per project.

You can send technical drawings after our first reply. Unknown values lead to questions – not to an estimated price commitment.