Wind turbine components are among the most demanding out-of-gauge transports: rotor blades are very long, tower sections very wide, nacelles very heavy. The last leg often runs over field and forest roads to the site.

What matters

Rotor blades
Extreme length – special vehicles and bend checks are mandatory.
Tower sections
Large diameters – width and height limit the route.
Nacelles and hubs
Heavy and compact – weight and axle loads count.
Site access
Access roads to the site must allow weight, length and bends.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Which components, with what dimensions and weights?
  2. How many turbines and pieces?
  3. What is the access road to the site like?
  4. Is there an erection schedule?
  5. From where – factory, port, storage?

What we need from you

  • Parts list with dimensions and weights
  • Site and access
  • Erection schedule
  • Collection point

Preparation: You hand over the cargo ready for loading with known lifting points – dismantling, assembly and foundation work are handled by your team or your installation partner.

What we do for you

What we organise

  • Feasibility check per project with questions on missing values
  • Coordination of permits, escort vehicles, route surveys and lifting equipment via partners
  • Quote with the agreed scope once the transport can be planned

Good to know

A finished, load-bearing access road is the basis for every delivery – we plan towards the manufacturer's erection date.

How it works

  1. 01

    Request

    You state the cargo, dimensions and weight per piece with units, rough route and time window – marking anything unknown.

  2. 02

    Review

    We check components, route and access and clarify vehicles, permits and escorts with partners.

  3. 03

    Quote

    After the feasibility check you receive a quote with the agreed scope, including partner services.

  4. 04

    Execution

    Transports after permit, in step with erection.

Questions and answers: Wind turbine components

Why are rotor blade transports so demanding?

Because of the extreme length: special vehicles, bend checks, escorts and often interventions on the route are needed.

Who is responsible for access to the wind farm?

The project. We state the requirements for width, bends and load capacity.

Can components be delivered in step with erection?

Yes, if permits are in place and the erection plan is coordinated.

Request

Request for this topic: Wind turbine components

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Parts list with dimensions and weights
  • Site and access
  • Erection schedule
  • Collection point

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm CET

Route and time window

Start (approx.)
Destination (approx.)

We check every route and come back with a proposal.

Time window

Cargo and project data

A short description is enough.

Dimensions per piece (L × W × H)

Please with unit. Comma or point as decimal separator, e.g. 3.85 m.

Weight per piece
Can the load be divided? (optional)
Known loading conditions (optional)

What should we coordinate via our partners? (optional)

Whether and to what extent anything is needed is checked per project.

You can send technical drawings after our first reply. Unknown values lead to questions – not to an estimated price commitment.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.

Have your project reviewed