LogisticooHeavy & Project

Industries

Heavy transport for large machine building

Manufacturers of large machines – presses, rolling mills, large machine tools, gearboxes – deliver assemblies that individually exceed the general limits. They travel dismantled to the customer and are assembled there.

What matters

Assemblies
Machines are split into assemblies for transport.
Heavy single pieces
Uprights, beds and housings determine vehicle and permit.
Export
Many deliveries go abroad – often via a port.
Assembly at the customer
Delivery matched to the assembly team.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Which assemblies, with dimensions and weights?
  2. Destination at home or abroad?
  3. Is there a port leg?
  4. What is the lifting situation at the customer?
  5. When does assembly start?

What we need from you

  • Parts list
  • Destination
  • Assembly date
  • Lifting situation

Preparation: You hand over the cargo ready for loading with known lifting points – dismantling, assembly and foundation work are handled by your team or your installation partner.

What we do for you

What we organise

  • Feasibility check per project with questions on missing values
  • Coordination of permits, escort vehicles, route surveys and lifting equipment via partners
  • Quote with the agreed scope once the transport can be planned

Good to know

For machines of normal dimensions, Logisticoo Machinery is your contact – out-of-gauge and heavy loads are planned here.

How it works

  1. 01

    Request

    You state the cargo, dimensions and weight per piece with units, rough route and time window – marking anything unknown.

  2. 02

    Review

    We check assemblies and route and clarify permits and partners.

  3. 03

    Quote

    After the feasibility check you receive a quote with the agreed scope, including partner services.

  4. 04

    Execution

    Transports after permit, delivery matched to assembly.

Questions and answers: Large machine building

When is Heavy & Project responsible rather than Machinery?

When assemblies are so large or heavy that permits, escorts or route surveys become necessary.

Can transport to an export port be organised?

Yes, the road leg to the port is common. Further legs are set out in the quote.

Who assembles the machine at the customer?

The manufacturer or its assembly partner.

Request

Request for this topic: Large machine building

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Parts list
  • Destination
  • Assembly date
  • Lifting situation

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm CET

Route and time window

Start (approx.)
Destination (approx.)

We check every route and come back with a proposal.

Time window

Cargo and project data

A short description is enough.

Dimensions per piece (L × W × H)

Please with unit. Comma or point as decimal separator, e.g. 3.85 m.

Weight per piece
Can the load be divided? (optional)
Known loading conditions (optional)

What should we coordinate via our partners? (optional)

Whether and to what extent anything is needed is checked per project.

You can send technical drawings after our first reply. Unknown values lead to questions – not to an estimated price commitment.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.

Have your project reviewed