Services
Moving large plant components to a new site
When production moves, some plant components are too large or heavy for normal machine transport: press bodies, furnace segments, large frames. Dismantling is done by the client or its assembly partner – we plan transport of the large pieces.
What matters
- Dismantling first
- The plant is dismantled by your team or assembly partner; the parts list results from this.
- Check the largest pieces first
- The heaviest and largest pieces determine permits and vehicles.
- Leaving the hall
- Clarify doors, overhead cranes and floor load at the old site.
- Reassembly
- Arrival coordinated with foundation and assembly at the new site.
Planning questions
We clarify these points before quoting – the earlier they are known, the more precise the plan.
- Which pieces exceed normal dimensions or weights?
- Who dismantles and reassembles?
- How do the pieces get out of the hall?
- Is the foundation at destination ready?
- What period applies?
What we need from you
- Parts list with dimensions and weights
- Sites
- Period
- Assembly contact
Preparation: You hand over the cargo ready for loading with known lifting points – dismantling, assembly and foundation work are handled by your team or your installation partner.
What we do for you
What we organise
- Feasibility check per project with questions on missing values
- Coordination of permits, escort vehicles, route surveys and lifting equipment via partners
- Quote with the agreed scope once the transport can be planned
Good to know
Plan dismantling and assembly with your team or the manufacturer's service – we bring the pieces safely to destination in between. Machines of normal dimensions are planned by Logisticoo Machinery.
How it works
- 01
Request
You state the cargo, dimensions and weight per piece with units, rough route and time window – marking anything unknown.
- 02
Review
We check the large pieces, exit and route and clarify permits and partners.
- 03
Quote
After the feasibility check you receive a quote with the agreed scope, including partner services.
- 04
Execution
Transport of the large pieces after permit, coordinated with dismantling and assembly.
Questions and answers: Plant components to a new site
How does a site relocation with Logisticoo work?
Your team or assembly partner dismantles, we transport the pieces in an agreed sequence to the new site – where assembly starts as planned.
What if only some pieces are out of gauge?
Then we plan those as heavy or out-of-gauge transport; normal machines can be handled by Logisticoo Machinery.
How do large pieces get out of the hall?
Through doors and with an overhead crane or partner equipment. Door dimensions and floor load are clarified in advance.
Request
Request for this topic: Plant components to a new site
Three steps. Anything you do not know yet can be left open.
Details for planning
- Parts list with dimensions and weights
- Sites
- Period
- Assembly contact