Heavy transport for chemicals and petrochemicals

Chemical parks and refineries receive heavy and long equipment for new builds and turnarounds: columns, reactors, vessels, heat exchangers, modules. Site rules apply, pipe bridges limit height, turnarounds set tight windows.

What matters

Site rules
Access, safety briefing and releases on site.
Pipe bridges
Limit height and route on the premises.
Turnarounds
Bundles and equipment out and in within a tight window.
Large cranes
Erecting columns and reactors via partners.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Which equipment, with dimensions and weights?
  2. New build or turnaround?
  3. What is the route on site like?
  4. Which site rules apply?
  5. Who provides the cranes?

What we need from you

  • Parts list
  • Plant and installation site
  • Time window
  • Site rules

Preparation: You hand over the cargo ready for loading with known lifting points – dismantling, assembly and foundation work are handled by your team or your installation partner.

What we do for you

What we organise

  • Feasibility check per project with questions on missing values
  • Coordination of permits, escort vehicles, route surveys and lifting equipment via partners
  • Quote with the agreed scope once the transport can be planned

Good to know

Hand over equipment cleaned and released – then it travels to your site without delay.

How it works

  1. 01

    Request

    You state the cargo, dimensions and weight per piece with units, rough route and time window – marking anything unknown.

  2. 02

    Review

    We check pieces, route and premises and clarify permits and partners.

  3. 03

    Quote

    After the feasibility check you receive a quote with the agreed scope, including partner services.

  4. 04

    Execution

    Transports after permit and site release, erecting via partners.

Questions and answers: Chemicals and petrochemicals

What must be considered for transports into a chemical park?

Site rules, releases, pipe bridges and bottlenecks on the premises – we clarify these with the operator.

Can equipment be transported during a turnaround?

Yes, outbound and return are planned towards the turnaround window.

How must equipment be prepared for transport?

Cleaned, emptied and released by the operator. Then it can travel without delay.

Request

Request for this topic: Chemicals and petrochemicals

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Parts list
  • Plant and installation site
  • Time window
  • Site rules

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm CET

Route and time window

Start (approx.)
Destination (approx.)

We check every route and come back with a proposal.

Time window

Cargo and project data

A short description is enough.

Dimensions per piece (L × W × H)

Please with unit. Comma or point as decimal separator, e.g. 3.85 m.

Weight per piece
Can the load be divided? (optional)
Known loading conditions (optional)

What should we coordinate via our partners? (optional)

Whether and to what extent anything is needed is checked per project.

You can send technical drawings after our first reply. Unknown values lead to questions – not to an estimated price commitment.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.

Have your project reviewed