Transporting industrial boilers

Steam and hot-water boilers for industry and heating plants travel as compact, heavy units – from the manufacturer to the site or when replacing old plant. The challenge is often getting them into the boiler house.

What matters

Compact and heavy
High weight on a small footprint – vehicle and floor load count.
Moving in
Through wall openings, roof openings or by skidding into the boiler house.
Replacement
Old boiler out, new boiler in – often within one window.
Attachments
Burners, fittings and insulation travel separately or are fitted later.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. What dimensions and weight?
  2. How does the boiler get into the building?
  3. Is an old boiler being removed?
  4. What is the access to the boiler house like?
  5. What time window applies?

What we need from you

  • Dimensions and weight
  • Route into the building (in conversation)
  • Time window
  • Old boiler yes/no

Preparation: You hand over the cargo ready for loading with known lifting points – dismantling, assembly and foundation work are handled by your team or your installation partner.

What we do for you

What we organise

  • Feasibility check per project with questions on missing values
  • Coordination of permits, escort vehicles, route surveys and lifting equipment via partners
  • Quote with the agreed scope once the transport can be planned

Good to know

Clarify insertion openings in wall or roof early – we plan crane and delivery to match.

How it works

  1. 01

    Request

    You state the cargo, dimensions and weight per piece with units, rough route and time window – marking anything unknown.

  2. 02

    Review

    We check dimensions, route in and access and clarify lifting and partners.

  3. 03

    Quote

    After the feasibility check you receive a quote with the agreed scope, including partner services.

  4. 04

    Execution

    Transport, unloading and – via partners – moving in up to the agreed point.

Questions and answers: Industrial boilers

How does a large boiler get into the boiler house?

Through existing or created openings, by crane or skidding – organised via partners.

Can the old boiler be taken away at the same time?

Yes, if agreed. Removal and release are done by the client.

Who opens the wall or roof for moving in?

The client or its construction company. We state the required dimensions.

Request

Request for this topic: Industrial boilers

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Dimensions and weight
  • Route into the building (in conversation)
  • Time window
  • Old boiler yes/no

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm CET

Route and time window

Start (approx.)
Destination (approx.)

We check every route and come back with a proposal.

Time window

Cargo and project data

A short description is enough.

Dimensions per piece (L × W × H)

Please with unit. Comma or point as decimal separator, e.g. 3.85 m.

Weight per piece
Can the load be divided? (optional)
Known loading conditions (optional)

What should we coordinate via our partners? (optional)

Whether and to what extent anything is needed is checked per project.

You can send technical drawings after our first reply. Unknown values lead to questions – not to an estimated price commitment.