Transporting large construction machinery

Large construction machines are heavy and wide: crawler excavators, dozers, wheel loaders, crawler cranes. Many drive onto the low-loader themselves – what matters is what is removed beforehand to reduce width and weight.

What matters

Weight and width
Tracks and buckets add width; counterweights add weight.
Removing parts
Transporting booms, buckets or counterweights separately can simplify a permit.
Self-loading
Many machines drive up ramps – check ramp angle and ground clearance.
Site changes
Often at short notice – allow for permit lead time.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Which machine, with operating weight and dimensions?
  2. What can be removed?
  3. Does it drive on itself?
  4. From which site to which?
  5. How short-notice is the move?

What we need from you

  • Machine, weight, dimensions
  • Removal options
  • Sites
  • Date

Preparation: You hand over the cargo ready for loading with known lifting points – dismantling, assembly and foundation work are handled by your team or your installation partner.

What we do for you

What we organise

  • Feasibility check per project with questions on missing values
  • Coordination of permits, escort vehicles, route surveys and lifting equipment via partners
  • Quote with the agreed scope once the transport can be planned

Good to know

Removed attachments often reduce dimensions and weight – tell us the transport dimensions without attachments.

How it works

  1. 01

    Request

    You state the cargo, dimensions and weight per piece with units, rough route and time window – marking anything unknown.

  2. 02

    Review

    We check weight, dimensions and route and clarify vehicle and permit.

  3. 03

    Quote

    After the feasibility check you receive a quote with the agreed scope, including partner services.

  4. 04

    Execution

    Driving on, securing, transport after permit, driving off at the site.

Questions and answers: Construction machinery

Does an excavator need special transport?

If weight or width exceed the general limits, yes. Removing attachments can help.

Does the machine drive onto the low-loader itself?

Usually yes, via ramps. We check ramp angle and ground clearance in advance.

How short-notice can a site change be?

That depends on the permit requirement. Without a permit it is faster than with one.

Request

Request for this topic: Construction machinery

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Machine, weight, dimensions
  • Removal options
  • Sites
  • Date

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm CET

Route and time window

Start (approx.)
Destination (approx.)

We check every route and come back with a proposal.

Time window

Cargo and project data

A short description is enough.

Dimensions per piece (L × W × H)

Please with unit. Comma or point as decimal separator, e.g. 3.85 m.

Weight per piece
Can the load be divided? (optional)
Known loading conditions (optional)

What should we coordinate via our partners? (optional)

Whether and to what extent anything is needed is checked per project.

You can send technical drawings after our first reply. Unknown values lead to questions – not to an estimated price commitment.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.

Have your project reviewed