LogisticooHeavy & Project

Industries

Heavy and out-of-gauge transport for the construction industry

Construction companies move large machines between sites and receive precast elements, modules and beams in assembly sequence. Many sites are in cities or next to traffic routes – access and time windows are tight.

What matters

Machine moves
Large excavators, dozers and cranes between sites.
Precast and modules
Delivery in assembly sequence, often straight from the vehicle.
Inner-city
Narrow access, closure times and no-stopping zones.
Ground
Site roads must carry vehicle and crane.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. What is to be transported – machine, precast element, module?
  2. Where is the site?
  3. What is the access like?
  4. Are there closure times?
  5. Who is the site management contact?

What we need from you

  • Cargo
  • Site
  • Access
  • Dates

Preparation: You hand over the cargo ready for loading with known lifting points – dismantling, assembly and foundation work are handled by your team or your installation partner.

What we do for you

What we organise

  • Feasibility check per project with questions on missing values
  • Coordination of permits, escort vehicles, route surveys and lifting equipment via partners
  • Quote with the agreed scope once the transport can be planned

Good to know

Apply for no-stopping zones at the site in good time – then the vehicle can stand right at the installation point.

How it works

  1. 01

    Request

    You state the cargo, dimensions and weight per piece with units, rough route and time window – marking anything unknown.

  2. 02

    Review

    We check cargo, access and dates with site management and clarify permits.

  3. 03

    Quote

    After the feasibility check you receive a quote with the agreed scope, including partner services.

  4. 04

    Execution

    Transport and delivery after permit and in the agreed sequence.

Questions and answers: Construction industry

Can Logisticoo move construction machinery between sites?

Yes, including large machines with a permit. We need weight and dimensions in transport position in advance.

What matters for inner-city sites?

Access, closure times and standing areas – and early coordination with site management.

Who applies for no-stopping zones at the site?

The site or site management. We state the area the vehicle needs.

Request

Request for this topic: Construction industry

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Cargo
  • Site
  • Access
  • Dates

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm CET

Route and time window

Start (approx.)
Destination (approx.)

We check every route and come back with a proposal.

Time window

Cargo and project data

A short description is enough.

Dimensions per piece (L × W × H)

Please with unit. Comma or point as decimal separator, e.g. 3.85 m.

Weight per piece
Can the load be divided? (optional)
Known loading conditions (optional)

What should we coordinate via our partners? (optional)

Whether and to what extent anything is needed is checked per project.

You can send technical drawings after our first reply. Unknown values lead to questions – not to an estimated price commitment.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.

Have your project reviewed