LogisticooHeavy & Project

Routes

Heavy transport Germany – Netherlands

Many project transports run between Germany and the Netherlands – to and from the seaports, for chemicals, energy and plant engineering. Two permits must fit together in time and at the border.

What matters

Two permits
German and Dutch decision, aligned to the same period.
Border transition
Change of conditions and escort at the border.
Ports
Often part of a chain with sea or inland vessel.
Canals and bridges
Shape the route on the Dutch side.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. In which direction, and to which destination?
  2. Dimensions and weight?
  3. Is there a shipping leg?
  4. Which time window?
  5. Who is the contact at both ends?

What we need from you

  • Addresses
  • Dimensions and weight
  • Time window
  • Further legs

Preparation: You hand over the cargo ready for loading with known lifting points – dismantling, assembly and foundation work are handled by your team or your installation partner.

What we do for you

What we organise

  • Feasibility check per project with questions on missing values
  • Coordination of permits, escort vehicles, route surveys and lifting equipment via partners
  • Quote with the agreed scope once the transport can be planned

Good to know

Tell us origin, destination and time window – we check permits for both countries and plan your project on this route.

How it works

  1. 01

    Request

    You state the cargo, dimensions and weight per piece with units, rough route and time window – marking anything unknown.

  2. 02

    Review

    We check route and permits in both countries and clarify partners.

  3. 03

    Quote

    After the feasibility check you receive a quote with the agreed scope, including partner services.

  4. 04

    Execution

    Transport with aligned permits, handover at destination.

Questions and answers: Germany – Netherlands

How many permits does a heavy transport Germany – Netherlands need?

Two – a German and a Dutch one, aligned to the same period.

Does the planning also apply in the opposite direction?

Yes, the questions are similar; the permits, however, apply per direction and route.

Are there customs formalities?

No, the route is intra-EU. Customs only becomes relevant if a subsequent sea leg leaves the EU.

Request

Request for this topic: Germany – Netherlands

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Addresses
  • Dimensions and weight
  • Time window
  • Further legs

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm CET

Route and time window

Start (approx.)
Destination (approx.)

We check every route and come back with a proposal.

Time window

Cargo and project data

A short description is enough.

Dimensions per piece (L × W × H)

Please with unit. Comma or point as decimal separator, e.g. 3.85 m.

Weight per piece
Can the load be divided? (optional)
Known loading conditions (optional)

What should we coordinate via our partners? (optional)

Whether and to what extent anything is needed is checked per project.

You can send technical drawings after our first reply. Unknown values lead to questions – not to an estimated price commitment.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.

Have your project reviewed