LogisticooHeavy & Project

Countries & regions

Heavy and out-of-gauge transport to the Netherlands

The Netherlands is the origin and destination of many project transports – via the ports and for chemicals, energy and plant engineering. Out-of-gauge and overweight loads need a Dutch exemption permit in addition to the German one.

What matters

Own permit
The Dutch exemption is needed in addition to the German decision.
Ports
Many project goods arrive at or leave from seaports.
Bridges and waterways
Movable bridges and canals shape the route.
Intra-EU
No customs between Germany and the Netherlands.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Where in the Netherlands – port, plant, site?
  2. Dimensions and weight per piece?
  3. Is there a sea or inland waterway leg?
  4. What time window applies?
  5. Who is the contact at destination?

What we need from you

  • Destination
  • Dimensions and weight
  • Time window
  • Further transport legs

Preparation: You hand over the cargo ready for loading with known lifting points – dismantling, assembly and foundation work are handled by your team or your installation partner.

What we do for you

What we organise

  • Feasibility check per project with questions on missing values
  • Coordination of permits, escort vehicles, route surveys and lifting equipment via partners
  • Quote with the agreed scope once the transport can be planned

Good to know

Planning from Berlin, execution with local partners – you have one contact for the whole project.

How it works

  1. 01

    Request

    You state the cargo, dimensions and weight per piece with units, rough route and time window – marking anything unknown.

  2. 02

    Review

    We check route and permit requirements in both countries and clarify partners.

  3. 03

    Quote

    After the feasibility check you receive a quote with the agreed scope, including partner services.

  4. 04

    Execution

    Transport with permits from both countries, handover at destination.

Questions and answers: Netherlands

Does a heavy transport to the Netherlands need its own permit?

Yes, in addition to the German permit a Dutch exemption is needed.

Can project cargo be brought to a Dutch port?

Yes, the road leg to the port is common. Further legs are set out in the quote.

Are there customs formalities?

No, transport between Germany and the Netherlands is intra-EU.

Request

Request for this topic: Netherlands

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Destination
  • Dimensions and weight
  • Time window
  • Further transport legs

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm CET

Route and time window

Start (approx.)
Destination (approx.)

We check every route and come back with a proposal.

Time window

Cargo and project data

A short description is enough.

Dimensions per piece (L × W × H)

Please with unit. Comma or point as decimal separator, e.g. 3.85 m.

Weight per piece
Can the load be divided? (optional)
Known loading conditions (optional)

What should we coordinate via our partners? (optional)

Whether and to what extent anything is needed is checked per project.

You can send technical drawings after our first reply. Unknown values lead to questions – not to an estimated price commitment.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.

Have your project reviewed