Transporting large switchgear and e-houses

Large switchgear, compact substations and e-houses combine volume, weight and sensitive equipment. They travel upright and with little twisting and are set on the foundation by crane at the installation site.

What matters

Sensitive equipment
Switch panels and electronics do not tolerate twisting or hard shocks.
Upright
Transport in installed position, secured against tipping.
Lifting points
Lifting lugs or spreader beams as specified by the manufacturer.
Installation site
Crane position and foundation at substation or plant.

Planning questions

We clarify these points before quoting – the earlier they are known, the more precise the plan.

  1. Which installation, with dimensions and weight?
  2. Are there manufacturer requirements on orientation and acceleration?
  3. Where are the lifting points?
  4. How is the installation site accessed?
  5. Who provides the crane?

What we need from you

  • Dimensions and weight
  • Manufacturer requirements
  • Installation site
  • Time window

Preparation: You hand over the cargo ready for loading with known lifting points – dismantling, assembly and foundation work are handled by your team or your installation partner.

What we do for you

What we organise

  • Feasibility check per project with questions on missing values
  • Coordination of permits, escort vehicles, route surveys and lifting equipment via partners
  • Quote with the agreed scope once the transport can be planned

Good to know

Agree the delivery time with manufacturer or grid operator – then connection and commissioning can follow directly.

How it works

  1. 01

    Request

    You state the cargo, dimensions and weight per piece with units, rough route and time window – marking anything unknown.

  2. 02

    Review

    We check dimensions, weight and requirements and clarify vehicle, permit and crane.

  3. 03

    Quote

    After the feasibility check you receive a quote with the agreed scope, including partner services.

  4. 04

    Execution

    Upright transport after permit, setting on the foundation with partner crane.

Questions and answers: Switchgear

How is large switchgear transported?

Upright, with little twisting and secured against tipping, according to the manufacturer's requirements.

Who sets the substation on the foundation?

A partner crane according to a lift plan; the date is coordinated with the installation site.

Does an e-house need a permit?

If dimensions or weight exceed the general limits, yes – which is common for e-houses.

Request

Request for this topic: Switchgear

Three steps. Anything you do not know yet can be left open.

Details for planning

  • Dimensions and weight
  • Manufacturer requirements
  • Installation site
  • Time window

Prefer to talk directly?

+49 30 346 467 850info@logisticoo.comMon–Fri 8am–6pm CET

Route and time window

Start (approx.)
Destination (approx.)

We check every route and come back with a proposal.

Time window

Cargo and project data

A short description is enough.

Dimensions per piece (L × W × H)

Please with unit. Comma or point as decimal separator, e.g. 3.85 m.

Weight per piece
Can the load be divided? (optional)
Known loading conditions (optional)

What should we coordinate via our partners? (optional)

Whether and to what extent anything is needed is checked per project.

You can send technical drawings after our first reply. Unknown values lead to questions – not to an estimated price commitment.

Contact and review

Anything that matters for planning.

Your details at a glance

Please review your details. “Edit” takes you back to the step; nothing is lost.

Have your project reviewed